How the contract works
Probability
How the price has moved
Analysis
Context
What moves the probability
Match already completed
The fixture took place on 14 August 2026, before this page's reference date of 16 August 2026. This is the dominant force behind the price: once a match ends, the contract stops being a forecast and starts tracking a known, reportable fact.
Official scorecard availability
Settlement depends on ESPNcricinfo's official match statistics, expected within two hours of the match ending. Any delay in that data pushes settlement toward the fallback of credible reporting consensus, which slightly widens the window for uncertainty but does not usually change the outcome.
On-field tiebreak rules
The market treats a Super Over result as decisive if the match is tied, which removes one common source of settlement ambiguity in the 100-ball format. This matters because tied matches, while uncommon, do happen in short-format cricket and would otherwise leave the result unclear.
Abandonment fallback
If the match had been abandoned with no result and no tiebreak possible, the rules specify a 50-50 resolution rather than a refund or extended settlement. English August weather makes this a real, if minor, structural risk built into the contract design even though it evidently did not apply here.
The case for
- For this contract to settle yes, Manchester Super Giants must be the side officially recorded as the winner of the 14 August 2026 match by ESPNcricinfo or, if that data is delayed beyond two hours, by credible reporting consensus.
- That win can be achieved through a standard run or wicket margin, a DLS-adjusted target in a rain-affected match, a Super Over after a tie, or a walkover or forfeit if either applied.
- The 100% consensus price is consistent with this condition already having been met and publicly reported.
The case against
- For the contract to settle no, Sunrisers Leeds must be the officially recorded winner under the same range of possible match outcomes, including a Super Over result if the match was tied.
- A match abandoned or cancelled without a winner, and without a tiebreak available, would resolve the contract at 50-50 rather than a clean no, which the current 100% price suggests did not happen here.
- Any dispute over the official scorecard before the 21 August 2026 settlement date could, in theory, delay resolution, though the rules provide a reporting-consensus fallback specifically to avoid that.
What to watch
Trade this contract
- gas covered
