Will Texas enact a statewide data center moratorium by June 30, 2027?

Resolution: Updated:

In short

The market treats a statewide moratorium as a minority outcome but not a remote one. The biggest reason is timing: the Texas Legislature only meets in regular session in odd years, so any such law has to move through the single session that opens in January 2027, and lawmakers already addressed grid strain this year through interconnection rules rather than a ban. A shift would most likely come from a grid emergency, a high-profile local backlash, or a governor-called special session that puts the issue back on the agenda.

Editorial illustration for: Will Texas enact a statewide data center moratorium by June 30, 2027?

How the contract works

A contract on this question settles at $1 if Texas enacts a qualifying statewide moratorium by 11:59 PM ET on 30 June 2027, and at nothing if it does not. The price at any moment is simply the market's current estimate of how likely that is to happen; a contract trading at 0.30, for example, would mean traders collectively see roughly a three-in-ten chance of enactment, not that the outcome itself is uncertain in some other sense. Settlement is based on the text of Texas law and official state government records, including exemptions: a measure that bans new data centers by default but carves out specific exceptions still counts as Yes under these rules, as long as the general prohibition applies to the broad class of new facilities. Anyone holding a position does not have to wait for settlement; it can be sold at whatever price the market is offering at the time.
What the market thinks happens
$100
Yes16%

The event happens

Costs now
$0.16
If you put in $100
$625
No84%

The event does not happen

Costs now
$0.84
If you put in $100
$119

Probability

History starts collecting once the event is tracked

How the price has moved

The contract currently sits at a consensus of 18% across tracked venues, with all $93,421 in recorded volume concentrated on a single platform, Polymarket. Because there is only one venue, there is no price spread to point to as evidence of disagreement between separate pools of traders, and the relatively modest volume means the figure reflects a limited amount of positioning rather than a deeply contested market. No specific day-to-day or week-to-week price history is available here, so this analysis does not attribute the current level to any single reported news event; it is better read as a standing assessment that enactment remains a minority outcome given the legislative calendar and the state's current policy direction, rather than the result of a sharp, traceable repricing.

Analysis

Context

Texas has become one of the largest data center and AI infrastructure markets in the United States, driven by cheap land, a deregulated grid, and aggressive state courting of tech investment. That growth has collided with concerns about the state's power grid, run by ERCOT, which has repeatedly flagged the scale of new electricity demand from large data centers and warned it could strain capacity during peak periods. Projects like the Stargate data center campus in Abilene, backed by OpenAI, Oracle and SoftBank and announced in 2025, illustrate the scale of investment now tied to Texas's ability to keep approving and connecting these facilities. This has produced political pressure in both directions. Some state legislators and local communities have pushed back against specific projects over water use, noise, and grid costs passed on to residential ratepayers. At the same time, the state government, including Governor Greg Abbott, has treated data center and AI investment as a core economic development priority, and the legislature's main response so far has been regulatory rather than prohibitive: new rules on how large loads interconnect to the grid, not a ban on new construction. The question being priced here is narrow and specific. It asks whether Texas enacts a law or constitutional provision that works as a default prohibition or suspension on approving, permitting, building, connecting, or operating new data centers statewide, or at least all new facilities above 100 MW, before the end of June 2027. A local ban, a partial regional measure, or a bill that only pulls tax incentives would not qualify.
The consensus figure across tracked venues is 18%, derived from a single active market on Polymarket with $93,421 in total trading volume. That is a modest amount of capital for a politically consequential question, which means the price should be read as a rough directional signal from a relatively small number of participants rather than a tightly contested consensus formed by heavy two-sided trading. There is no venue spread to analyze here, since only one platform lists the contract, so the 18% figure stands alone rather than as a midpoint between competing views. The structural case against enactment rests on the Texas legislative calendar. The Texas Constitution sets regular sessions in odd-numbered years only, convening on the second Tuesday in January and running 140 days. That means the entire legislative window available before the 30 June 2027 cutoff is the 2027 regular session, which opens in mid-January and would need to produce, pass, and get a governor's signature on a moratorium bill within roughly four and a half months, unless Governor Abbott calls a special session on the issue. That is a narrow runway for a measure that would directly contradict the state's recent economic development posture toward AI and data center investment. Working against a flat No is the fact that the underlying pressure is real and growing. ERCOT's own grid planning has cited large flexible loads, including data centers, as a material factor in future capacity needs, and earlier in 2025 lawmakers already moved on this terrain by passing rules governing how large loads interconnect to the grid rather than ignoring the issue. That shows the legislature is willing to regulate data center growth; the open question priced by this market is whether it is willing to go further, to an outright default prohibition, which is a materially larger step than interconnection standards or curtailment requirements. The settlement rule's exemption language also matters for how this probability should be read. Because a law can carve out specific exceptions and still count as Yes, the bar is somewhat lower than a literal, no-exceptions ban on all data centers; a bill that defaults to prohibiting approval for most new large facilities, while exempting a defined set of existing or already-permitted projects, would likely still qualify. That nuance probably keeps the price from sitting at the very bottom of the range, even though full enactment within the timeline remains the harder case to argue.

What moves the probability

  1. 2027 legislative calendar

    Texas only holds a regular legislative session in odd years, and the 2027 session is the sole scheduled window before the 30 June 2027 cutoff. A bill has to be filed, pass both chambers, and be signed within roughly 140 days starting mid-January 2027, which compresses the timeline for passing a measure as significant as a statewide moratorium.

  2. Grid capacity pressure from ERCOT

    ERCOT has flagged large flexible loads, including data centers, as a growing share of forecast demand, which pushes toward more legislative scrutiny. This raises the probability modestly by keeping the issue live, even though it has so far produced interconnection rules rather than a ban.

  3. State economic development priorities

    Texas officials, including Governor Abbott, have actively courted AI and data center investment, treating it as a jobs and tax-base win. This is the strongest force pushing against enactment, since a moratorium would directly reverse that stated economic strategy.

  4. 2025 interconnection rules as a substitute

    Earlier action addressing large-load grid connection requirements suggests the legislature's preferred tool is regulation of how data centers connect and operate, not prohibition of new ones. That reduces the likelihood lawmakers escalate to a full moratorium in the next session.

  5. Possibility of a special session

    The governor can call a special session at any time, which would reopen the legislative window outside the normal odd-year schedule. A grid failure, a high-profile local dispute, or a political flashpoint before mid-2027 could trigger this and meaningfully change the calculus.

The case for

  • A moratorium bill would need to be filed and advance through the Texas House and Senate during the regular session convening in January 2027, or during a special session called before 30 June 2027.
  • The bill would need to establish a default prohibition on approving, permitting, connecting, or operating new data centers statewide, or specifically those above 100 MW, even if it carves out defined exemptions.
  • A triggering event, such as a severe ERCOT grid strain episode, a high-visibility local controversy, or bipartisan concern about electricity price pass-through to residential ratepayers, would need to build enough pressure before the legislative session to make the measure viable.
  • The governor would need to sign or allow the bill to become law rather than veto it, which would mark a reversal from the state's current posture favoring data center investment.

The case against

  • Texas's regular legislative session only runs for roughly 140 days starting in mid-January 2027, leaving little room for a major new prohibition to be drafted, negotiated, and enacted before the cutoff.
  • The legislature already addressed data center grid demand in 2025 through large-load interconnection requirements rather than a ban, suggesting regulation, not prohibition, is the preferred approach.
  • Texas state leadership, including the governor's office, has consistently promoted the state as a destination for AI and data center investment, creating political resistance to a measure that would halt that growth.
  • No special session focused on this issue has been reported, and absent one, the single 2027 regular session is the only available vehicle, narrowing the practical path to enactment.

What to watch

The key date is the convening of the Texas Legislature's regular session, which under the state constitution begins on the second Tuesday in January 2027. Bill filing deadlines typically fall in the first two months of a session, so any moratorium proposal would need to surface by roughly March 2027 to have a realistic path through committee and floor votes before the session's 140-day limit runs out around early June 2027. Separately, any announcement of a special session by the governor before 30 June 2027 would reopen a legislative window outside that normal schedule and is worth watching independently, as would any further ERCOT capacity warnings or high-profile local disputes over specific data center projects that could shift legislative appetite.

Trade this contract

Venues (1)

More about this event

Venues (1)

Probability

  • Will Texas enact a data center moratorium by June 30, 2027?16%
  • Will Texas enact a data center moratorium by December 31, 2026?2%

Resolution rules

Determined by
Texas legislature and state government official records
Resolution date

This resolves based on whether Texas enacts, by 11:59 PM ET on 30 June 2027, a law or constitutional provision that generally prohibits or suspends approval, permitting, construction, grid interconnection, or operation of all new data centers statewide, or of all new data centers above 100 MW of interconnection capacity. The determination is made using the Texas legislature's official actions and state government records; local-only measures, partial geographic bans, or laws that merely remove tax incentives do not qualify. Only one venue, Polymarket, currently lists this contract, so there is no cross-venue settlement discrepancy to note at this time.

Calculation methodology โ†’

Local context

Texas hosts some of the largest announced AI infrastructure investments in the country, including the Stargate data center campus in Abilene backed by OpenAI, Oracle and SoftBank, so a statewide moratorium would directly affect projects tied to major US technology companies that this audience already follows. It would also touch the ERCOT grid, which supplies power to a large share of the state and has been cited as a stress point for electricity costs as data center demand grows; a moratorium or its absence has a plausible, if indirect, bearing on US electricity prices and on the pace of AI infrastructure buildout more broadly.

Common questions

What exactly settles this market, and when?
It settles based on whether the State of Texas enacts a law or constitutional provision establishing a statewide moratorium on new data center approval, permitting, construction, interconnection, or operation, generally or for facilities above 100 MW, before 11:59 PM ET on 30 June 2027. The determination rests on the Texas legislature's actions and official state government records, with settlement occurring on 1 July 2027.
What does the current market price actually mean?
The price is the market's running estimate of the probability of enactment, not a prediction guaranteed to be correct. A contract priced at, say, 0.30 would mean the market collectively sees about a three-in-ten chance of the moratorium happening, purely as an illustration and not this market's actual level.
Would a law with exemptions still count as Yes?
Yes. The settlement rules specify that specific exemptions do not disqualify a measure, as long as the law prohibits approval by default for the broader class of new data centers or those above 100 MW. A narrowly targeted carve-out law, rather than a true default prohibition, would not qualify.
What happens if the legislature runs out of time or the bill stalls in committee?
If no qualifying law is enacted by the 30 June 2027 deadline, the market resolves No, regardless of whether a bill was introduced, debated, or passed one chamber. Partial progress, such as a bill that only reaches committee, does not count toward Yes.
Did Texas already do anything on this issue before now?
Earlier in 2025, Texas lawmakers passed rules addressing how large loads, including data centers, interconnect with the ERCOT grid, rather than restricting new facilities outright. That approach is treated as a regulatory alternative to a moratorium, not a step toward one.
Could a special session change the outcome?
Yes. The governor can call a special session at any point before the 30 June 2027 cutoff, and a qualifying law passed and enacted during a special session would count the same as one passed during the regular 2027 session.